Does the sewer system services need to be shut down for installation to take place?

With the use of STAR, at no time does the service laterals or the mainline need to be shutdown. With flows that exceed 50% of the carrying capacity of the sewer, a by-pass pumping system may be installed per the discretion of the contractor.

Add new comment

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Image CAPTCHA
Enter the characters shown in the image.